home

contact
Topics:       
Magyar   |   Română   |   English   |   Deutsch
Subscribe to our newsletter!
Solar Decathlon Europe

Evolo.us

Welcome to our website
:: Expension of buildings of S.C. TUSNAD S.A. with an energy-efficient Resort and Hydropathic establishment - Study plan
Weather
Press
Modernization of County Personal Identity Bureau of Saint George town - Study plan
Modernization of buildings of Art School in Saint George A,B buildings - Study plan
Expansion and rehabilitation of buildings of Gábor Áron Technological Highschool _ Hostel building
Rehabilitation of the "Dr. Fogolyán Kristóf" Emergency County Hospital at Saint George
Hotel*** Covasna
Exterior repairs of the Town Hall Martineni
Rehabilitation and expansion of the “Csipike” kindergarten at Saint George
Expansion, modernization and rehabilitation of buildings of Székely Mikó Highschool _ E1 building
Reception centre “The prince and the pauper” , Saint George
“ The hydropathic establishment that is going to be built on Hatuica will become the treating center for symptoms of vascular attaches and locomotor disorders.” Zoltan Kisgyorgy
Gym Hall, Ghidfalau
Building of a Ford showroom
Sports-court, Zabala
Rehabilitation of psychiatry's building
Design
“…. And it may be needed something else to be taken into consideration, namely, that the word edification has two main meanings: construction and moral ascension. Due to the agile intellectual interactions between philosophy and architecture we are able to generate the distant analogy between them. So, the edification has to possess ethical nature it has to bottom on the dialogue among the choices of value. On the one hand the thinking, on the other hand, the present state of architectural experience- this may be our temporary and restricted conclusion- the only possibility that construction has within the meaning of edification is that to create in an ethical manner. “ Kenneth Frampton

www.uauim.ro , www.architecture.com , www.architekt.de , www.architectes.org , www.architetto.info , www.epiteszforum.hu.
Building operations
“ Before beginning the building operations, every detail of the layout and the completion of the building that is to be built has to be scrutinized. In case of each building there are three things that need to be taken into consideration, without even one of them, none of the buildings can be worth the honorable mention; these qualities are: expedience or commodity, durability and beauty. A creation which is utile but only for a short period of time , or which is not comfortable after a longer period of time, or which even though it possess both characteristics, it does not dispose of grace, it cannot be named perfect..” Andrea Palladio

www.constructii.ro , www.construction.com , www.der-bau.com , www.chantier.net, www.e-epites.hu, www.mit.edu.
Building technique system
The task of the building technique system is to insure the user of the building about the conveniences, drinking-water, the diversion of the refuse water, the appropriate temperature, air of appropriate quality and parameter.
The building technique system is generally engaged in dealing with inner plumbing and the equipment and device connected with it.
The building technique system has the following components:
- heating technology
- water supply, drainage
- gas supply ( diversion of stack gas)
- HHVAC ( heating, ventilation and air conditioning)
- Climate technology.

www.instalatii.ro , www.installation.com , www.installation.de , www.installations-electriques.net , www.megsz.hu , www.installationeurope.com.
Building of water- conduits and drainage
We offer optimal solutions for canal-building in the field of canal-building activities with opened building methods. These performances comprehend beside pipe-laying all other auxiliary activities, too, such as excavating, hole-digging, insurance activities, as well as filling in and closing of the surface.

Static content

[Content tartalom]